Since being commissioned, both ANZAC frigates have been working at a heavy operational pace. Initially there were some further equipment failures, with Te Kaha having its gas turbine propulsion unit replaced under guarantee in September 1998. The following July it once more had problems with the propshaft bearings, and these were replaced in dry dock in Devonport, Auckland. The final build problem was discovered when Te Kaha was once more in dry dock for its Annual Maintenance Period in May 2002. Microscopic cracks had been found in the bilge keels of several of the Australian ANZAC frigates, and similar cracks were discovered in Te Kaha. Design solutions were supplied by both the shipbuilder and the designer. Te Mana had fewer reported faults, a broken camshaft in one of the diesel engines being one of them.
‘Fitted for but not with’ was one of the catch-phrases of the time, leading to charges that the vessels would not be adequately armed. In 1996 the RAN instituted proposals to improve the warfighting capabilities of its vessels, with the introduction of its Warfighting Improvement Program, but the RNZN had no involvement. However, by the time the frigates were in service, there had been a number of additions to the weapon systems.
Original costings had been based on one medium calibre (76mm) gun and one battery of anti-aircraft missiles. Plans were underway at an early stage to fit refurbished Mk32 ship-launched torpedo tubes from the Leanders, and Te Kaha was fitted with the tubes from Southland. Provision was also made, and the vessels subsequently fitted with, the Phalanx close-in weapon support system, Te Kaha inheriting the system from HMNZS Waikato. The vessels were also designed to accommodate a towed array sonar system, with which they have been fitted from time to time.
Perhaps the most significant weapons upgrade was the addition of the SH-2G Super Seasprite helicopter, built by Kaman Aerospace in the United States. The maximum initial cost of four new-build helicopters was set not to exceed NZ$274 million in 1997—a decade after the frigate debate had begun in earnest. Whilst the new aircraft were being built, Kaman loaned the RNZN four SH-2Fs from the US Navy, the first of these flying in February 1998. Ultimately a decision was taken to acquire five new aircraft. The first two new aircraft were accepted in Auckland on 18 August 2001, with deliveries of all five due to be completed by 2003. Despite their not inconsiderable cost, they arrived with a minimum of fuss.
These aircraft added significantly to the capability of the vessels. They were fitted with advanced radar and electronic support measures equipment, and could be fitted with Maverick air-to-surface missiles, or Mk 46 torpedoes or Mk 11 depth charges, considerably extending the reach of the frigates. By the time the ANZAC frigates were sent in harm’s way, they were significantly better armed than might have been anticipated. A decade previously Lange had said:
We’re stuck with them now. Sometimes you win Lotto and sometimes you don’t, and we didn’t win on that one. I cannot see any justification for the frigates continuing. I just can’t. I cannot get anyone in Defence to tell me what they’re going to be used against. They cannot tell me how things of that specification are to be used. I come back to what we need. We need a logistic support ship to support the army and we need to have a platform to take to the Pacific for the sort of support work that needs to be done, but the frigates don’t do it.[87]
However, history has once again proven that it is never possible to predict future defence scenarios. True to the original intent of having vessels that would undertake resource protection close to home, Te Kaha sailed to the Ross Dependency amidst much media publicity in February 1999, to deter Patagonian Toothfish poachers. Later that year though, she was dispatched to provide support to International Force East Timor (INTERFET), and then to the Persian Gulf to join the Multinational Interception Force. In June 2000 Te Mana was sent to Honiara in the Solomon Islands for guardship duties, and was relieved later that month by Te Kaha. Both vessels were to return—Te Kaha in September, and Te Mana in May 2001. For five months in 2002 Te Mana was deployed to Asia, returning in July, and Te Kaha left the following month for a four month tour of duty in Asia. During the return voyage to New Zealand Te Kaha was diverted to the Persian Gulf once more, to take part in Operation Enduring Freedom, and was replaced on station in February 2003 by Te Mana. During the 2002–2003 reporting year, the two frigates were programmed for a total of 251 days at sea. In fact they worked a total of 337 days at sea. In April 2004 Te Mana once more deployed to the Persian Gulf for a four month period of Maritime Interdiction Operations (MIO). During the 2003–2004 reporting year, the two frigates were programmed for a total of 287 days at sea, yet worked a total of 307 days.[88] This high level of activity continued to be maintained over the next four years. In the 2006–2007 reporting year programmed activity was to be a minimum of 272 days at sea, yet the two frigates achieved 290 sea days. In April 2008 Te Mana once more left Auckland for a five month period to undertake operations in the Persian Gulf as part of the Coalition Task Force. Such a pace of operations in distant waters was not what was envisaged as New Zealand’s area of direct strategic interest when the ANZAC debate first began, and yet again reinforced the role of external sources of influence in the life of the ANZAC frigates.